CYCLE 4 Stress Plan v0.1
Date: 2026-04-19Status: startedFocus: D03 (review), robustness audit, final cycle decision.
Goals
- Rerun D03 with a revised operating criterion to recover condom/degenerative coexistence.2. Perform sensitivity stress tests on thresholds (
Phi,Loss_U, ambiguous band).3. Consolidate reproducibility audit on D02/A01/D03.
Work packages
WP1 - D03 Revision
- Redefine "ambiguous" class with non-adaptive pre-registered rule.- Compare at least 2 robust classification schemes.- Output:
results_D03_cycle4_v0_1.md.
WP2 - Stress/Ablation
- Stress on input noise and distributional shift.- Ablation on proxy components (
jaccard,soft_overlap,loss_u).- Output:stress_ablation_cycle4_v0_1.md.
WP3 - Final Audit
- Replay of runs with declared seeds.- Check log consistency and aggregate metrics.- Output:
CYCLE_4_REPORT.md.
Cycle 4 exit criterion
validatedif global protocol criteria met;-reviseif partial but not robust evidence;-rejectif falsified criteria.