OCT Validation Cycles Plan v0.1
Initial date: 2026-04-16
Update date: 2026-05-05
Objective: maintain a reproducible cycle architecture for theorem validation.
Historical baseline (completed)
- Cycle 1 - pilot formal/setup -
completed - Cycle 2 - independent benchmark #1 -
completed - Cycle 3 - independent benchmark #2 + multi-context replication -
completed (mixed) - Cycle 4 - stress/ablation/repro audit + unified decision baseline -
completed
Why a new cycle is required
External and internal audits identified structural anti-pattern risks:
- comparative level-shift (A01)
- post-hoc rescue drift (D03)
- existential vacuum-pass + evidence-class accumulation issues (D02)
Therefore Cycle 5 is defined as a method hardening cycle, not a cosmetic rerun.
Cycle 5 (v5.3 lane)
Cycle folder: CYCLE_5_2026-05-01/
Status: specification complete, execution pending
Scope:
- A01 process-level validation refactor
- D03 locked taxonomy refactor
- D02 evidence-class split refactor
- predeclared reject rules
Mandatory gate before execution:
OCT_EX_ANTE_PROXY_GATE_POLICY_v0_1.mdtemplates/OCT_PROXY_PREVALIDATION_SHEET_v0_1.mdOCT_CLAIM_TYPE_ANTIPATTERN_CHECKLIST_v0_1.md
Cycle 5 decision policy
Theorem decision options:
pass_candidaterevise_neededreject_candidate
Promotion to validated is blocked unless:
- gate pass exists
- preregistration seals are valid
- reject triggers are absent
- evidence-class reporting is complete
Operational note
Cycle count alone is not evidence quality.
Only cycle outputs that satisfy gate and preregistration constraints are admissible for theorem promotion.
Cycle 6 (v5.4 lane candidate)
Cycle folder: CYCLE_6_2026-05-05/
Status: specification complete, execution not started
Scope:
- A01-only focused cycle
- Real implementation split (
P_clsvsP_ord) - Independent benchmark mandatory (no overlap with
cycle3_inputs) - Dual external audit checkpoint before theorem promotion
Key rationale:
- Round-4 audit confirmed A01 heuristic proxy mode is non-promotable.
- Stress test (
0/135) confirmed structural non-testability in current synthetic proxy family. - Promotion path requires real pipeline evidence.
Mandatory gate before execution:
OCT_EX_ANTE_PROXY_GATE_POLICY_v0_1.mdtemplates/OCT_PROXY_PREVALIDATION_SHEET_v0_1.md(A01 instance)CYCLE_6_2026-05-05/CYCLE_6_BENCHMARK_INDEPENDENCE_PROTOCOL_v0_1.md- Valid A01 prereg seal with entry/exit signature fields