OCT Update Plan v5.3
Date: 2026-05-01
Owner: OCT program (Fabio Ghioni + collaborators)
Status: in progress (Phase 1-4 minimum package completed)
Objective
Upgrade OCT validation and editorial baseline from v5.2.0 to v5.3 with:
- explicit anti-pattern controls
- ex-ante proxy gate
- A01/D02/D03 validation hardening
- publication sync without overclaiming
Scope
In scope:
- OCT validation governance artifacts
- theorem decision rationale alignment
- Chapter 17 methodological alignment
- benchmark process and preregistration workflow
Out of scope:
- full theorem re-validation execution (implemented in later cycles)
- complete rewrite of foundational book chapters beyond targeted patches
Phase 1 - Editorial and methodological alignment
Target window: 2-3 days
Status: completed (2026-05-01)
Deliverables:
- Import external review inputs into official validation corpus.
- Replace generic
revisemotivation with technical rationale tied to Chapter 8 Definition 8.12. - Add explicit references to anti-pattern and A01 gate design documents in OCT validation navigation.
- Log start of v5.3 in publication/validation trackers.
Completion criteria:
- external reviews available in repository
- decision matrix updated with technical
reviserationale - v5.3 plan file published and linked
Phase 2 - Ex-ante proxy gate
Target window: 2 days
Status: completed (2026-05-01)
Deliverables:
Proxy Pre-Validation Sheettemplate (mandatory before benchmark execution).- Role-separation rule: proxy designer != proxy auditor.
- Falsifiability reachability check (must be demonstrable before run).
- Claim-type to anti-pattern mapping checklist (existential/comparative/taxonomic/universal).
Completion criteria:
- template published
- policy statement published
- no new cycle can start without gate pass
Phase 3 - A01/D02/D03 validation refactor
Target window: 4-6 days
Status: specification completed (2026-05-01), execution pending
Deliverables:
- A01: process-level metric pipeline (trajectory + gate decisions), replacing output-only proxy logic.
- D03: strict no-post-hoc-rescue policy on same data under same preregistration.
- D02: strict separation of evidence classes (formal pilot vs empirical benchmark).
- Updated cycle specs with rejection conditions predeclared.
Completion criteria:
- revised cycle specs committed
- reject conditions and thresholds preregistered
- evidence classes marked in decision artifacts
Phase 4 - Minimum operational implementation
Target window: 5-7 days
Status: completed (minimum package, 2026-05-01)
Deliverables:
- Append-only trajectory logging schema.
(O)/(P)/(C)label discipline on metrics.- Preregistration sealing (hash + timestamp).
- Audit script for gate compliance checks.
Completion criteria:
- logging schema in repo
- prereg artifacts testable
- compliance audit runnable
Phase 5 - Freeze and publication sync
Target window: 2 days
Status: pending
Deliverables:
- Freeze candidate v5.3 package.
- Synced updates on GitHub + Zenodo + OSF + Hugging Face.
- Release note with anti-pattern controls and validation-state transparency.
Completion criteria:
- DOI/version snapshots aligned
- public links and notes synchronized
Governance rules (non-negotiable)
- No theorem promotion without ex-ante gate pass.
- No threshold/criterion changes post-hoc on the same dataset.
- No evidence accumulation across heterogeneous epistemic classes without explicit separation.
- Every claim state change must reference code + proxy sheet + preregistration artifact.
Current progress log
- 2026-05-01: Plan file created (
OCT_UPDATE_PLAN_v5_3.md). - 2026-05-01: External review inputs imported.
- 2026-05-01: Decision matrix motivation updated to technical Def 8.12 rationale.
- 2026-05-01: Phase 2 delivered:
templates/OCT_PROXY_PREVALIDATION_SHEET_v0_1.mdOCT_EX_ANTE_PROXY_GATE_POLICY_v0_1.mdOCT_CLAIM_TYPE_ANTIPATTERN_CHECKLIST_v0_1.md
- 2026-05-01: Phase 3 specification package delivered:
CYCLE_5_2026-05-01/CYCLE_5_A01_PROCESS_LEVEL_SPEC_v0_1.mdCYCLE_5_2026-05-01/CYCLE_5_D03_LOCKED_TAXONOMY_SPEC_v0_1.mdCYCLE_5_2026-05-01/CYCLE_5_D02_EVIDENCE_CLASS_SPEC_v0_1.mdCYCLE_5_2026-05-01/CYCLE_5_EXECUTION_AND_REJECT_RULES_v0_1.mdCYCLE_5_2026-05-01/CYCLE_5_PREREG_SEAL_TEMPLATE_v0_1.md
- 2026-05-01: Phase 4 minimum runtime package delivered:
runtime/OCT_APPEND_ONLY_TRAJECTORY_SCHEMA_v0_1.jsonruntime/OCT_PREREG_SEAL_SCHEMA_v0_1.jsonruntime/check_gate_compliance.py- compliance report generated:
runtime/compliance_report_v0_1.json
- 2026-05-05: Cycle 6 launch package published (A01 real-pipeline promotion path):
CYCLE_6_2026-05-05/CYCLE_6_OVERVIEW_v0_1.mdCYCLE_6_2026-05-05/CYCLE_6_A01_REAL_PIPELINES_SPEC_v0_1.mdCYCLE_6_2026-05-05/CYCLE_6_EXECUTION_AND_REJECT_RULES_v0_1.mdCYCLE_6_2026-05-05/CYCLE_6_BENCHMARK_INDEPENDENCE_PROTOCOL_v0_1.mdCYCLE_6_2026-05-05/CYCLE_6_EXTERNAL_AUDIT_PLAN_v0_1.mdCYCLE_6_2026-05-05/CYCLE_6_PREREG_SEAL_TEMPLATE_v0_1.mdRUNBOOK_CYCLE6_EXECUTION_v0_1.md