CYCLE 6 Overview v0.1
Date: 2026-05-05
Status: specification package (execution not started)
Scope: A01 real-pipeline validation (promotion path candidate)
Objective
Run a focused cycle for A01 with independent real implementations, replacing heuristic proxy scoring as theorem-level evidence basis.
Cycle 6 target:
- Validate (or falsify) A01 through executable pipeline behavior, not synthetic branch formulas.
- Enforce benchmark independence from
cycle3_inputs. - Preserve v5.3/v5.3.1 governance constraints (ex-ante gate, prereg seal, role separation, cycle budget).
- Produce an externally auditable release pack for A01.
Why Cycle 6 exists
Round-4 external audit established:
- A01 heuristic proxy mode is non-promotable by policy.
- Stress test (
0/135) shows structural non-testability for process-only advantage in current proxy family. - A01 promotion requires real pipeline implementations (
P_clsandP_ord) on independent benchmark data.
Required gate artifacts before execution
- Filled
OCT_PROXY_PREVALIDATION_SHEET_v0_1.mdinstance for A01. - Valid prereg seal JSON for A01 with entry/exit signature fields.
- Locked benchmark manifest with non-overlap proof vs
cycle3_inputs. - Independent auditor designation (primary: Solomon, secondary: TBD external reviewer).
If any artifact is missing, cycle status is blocked.
Cycle 6 spec files
CYCLE_6_A01_REAL_PIPELINES_SPEC_v0_1.mdCYCLE_6_EXECUTION_AND_REJECT_RULES_v0_1.mdCYCLE_6_BENCHMARK_INDEPENDENCE_PROTOCOL_v0_1.mdCYCLE_6_EXTERNAL_AUDIT_PLAN_v0_1.mdCYCLE_6_PREREG_SEAL_TEMPLATE_v0_1.md
Output contract (when executed)
Required outputs:
CYCLE_6_2026-05-05/trajectory/A01_trajectory_events.jsonlCYCLE_6_2026-05-05/results/A01_real_pipeline_metrics_v1_0.jsonCYCLE_6_EXECUTION_REPORT_A01_v1_0.mdCYCLE_6_DECISION_GATE_v1_0.mdCYCLE_6_REPRO_PACK_MANIFEST_v1_0.mdCYCLE_6_EXTERNAL_REPLICATION_NOTE_v1_0.md